MIDDLEBURGH PILOT PROJECT

Showing the work,
from first calculation.

Our own home is becoming Sevin’s first fully documented heat pump case study. This page will grow as the project moves from design through operation.

BUILDING~1,450 sq. ft. home
PROJECTWhole-home conversion
EXISTING SYSTEMOil furnace + ductwork
WHY A PILOT

Credibility should be documented, not manufactured.

The project gives us a place to test the complete operating process: estimating, sizing, procurement, installation, decommissioning, incentive documentation, and performance review.

We’ll publish both the polished result and the decisions behind it.

PROJECT STATUS

From plan to proof.

01

Planning

Existing-condition review, room-by-room load calculation, and system comparison.

02

Installation

Ductwork updates, equipment installation, electrical coordination, and oil-system decommissioning.

03

Verification

Commissioning, documentation, incentive closeout, and performance tracking.

Planning a similar conversion?

Start a conversation
CREDENTIALS & TRAININGQualified for the work.
Accountable for the result.
608EPA UNIVERSALSection 608 certified
✓HVAC FOCUSEDCoverage is being finalized
WWOMAN-OWNEDNew York small business